LIVE DEMO NEC4 ECC Option C

P6Pulse.Com Demonstration Project

Activity ID

March 2025 3

Reinforcement fixing, abutment trial panel

Reinforcement fixing, abutment trial panel

27 Mar 2025 · S1010

Transformer at the utility diversion interface

Transformer at the utility diversion interface

21 Mar 2025 · U1010

Bulk earthworks cut, loading to haul trucks

Bulk earthworks cut, loading to haul trucks

18 Mar 2025 · W1010

February 2025 1

Topsoil strip under way, aerial view

Topsoil strip under way, aerial view

11 Feb 2025 · W1000

January 2025 2

Existing substation adjacent to the utility survey area

Existing substation adjacent to the utility survey area

28 Jan 2025 · E1040

Scaffold erected for site establishment

Scaffold erected for site establishment

24 Jan 2025 · E1000