LIVE DEMO NEC4 ECC Option C

P6Pulse.Com Demonstration Project

Reporting period

Period comparison slides

PowerPoint for the progress meeting: cover, this period vs last period, S-curve and Key Dates.

Full reporting pack

Every sheet below in one workbook — KPIs, S-curves, activities, changes, DCMA, milestones and NEC narrative.

S-curve by discipline

Planned, actual and forecast cumulative % by month per discipline, with native Excel charts.

S-curve by WBS group

The same S-curve data broken down by top-level WBS group, with charts.

Activity register

Every activity with baseline vs current dates, durations, % complete, float and constraints.

Changes in period

Added/deleted activities, duration, logic, constraint and date movements — one sheet each.

DCMA 14-point audit

Summary with pass/fail formatting plus the full list of flagged activities per check.

Milestone tracker

Key dates with baseline, previous and current forecast plus variance and movement.

NEC report (Word)

Branded P6 Pulse Word document: headline figures, AI narrative, Key Dates, CE & EW registers, DCMA and sign-off block.

NEC report pack

NEC narrative (if generated), KPI summary, milestone tracker and registers for the clause 32 submission.

EW & CE registers

Compensation event and early warning registers with time/cost totals and the adjusted Completion Date.