P6Pulse.Com Demonstration Project
Period comparison slides
PowerPoint for the progress meeting: cover, this period vs last period, S-curve and Key Dates.
Full reporting pack
Every sheet below in one workbook — KPIs, S-curves, activities, changes, DCMA, milestones and NEC report narrative.
S-curve by discipline
Planned, actual and forecast cumulative % by month per discipline, with native Excel charts.
S-curve by WBS group
The same S-curve data broken down by top-level WBS group, with charts.
Activity register
Every activity with baseline vs current dates, durations, % complete, float and constraints.
Changes in period
Added/deleted activities, duration, logic, constraint and date movements — one sheet each.
DCMA 14-point audit
Summary with pass/fail formatting plus the full list of flagged activities per check.
Milestone tracker
Key dates with baseline, previous and current forecast plus variance and movement.
NEC report (Word)
Branded Word document with your contractor and client logos: headline figures, AI narrative, key dates, EW & CE registers, DCMA and sign-off block.
NEC report pack
NEC report narrative (if generated), KPI summary, milestone tracker and registers.
EW & CE registers
Compensation Events and early warnings registers with time/cost totals and the adjusted Completion Date.